Service contract pricing per apartment per year

All Detailed points included parts and not included parts in Contract

Price with

Price without

Contract with Spare parts

Contract without spare parts

for standard apartment or flat

 

Point in Contract

Included parts

Excluded parts

Service included

the prices subject to status of place

1

Water Supply Sys. And water drain Sys.

All surface mounted fittings

inside wall pipes

Cleaning all water system and Disinfection

40 JD's/month include cleaning of water tank and Lab. Reports 2 times per year

25 JD's /month include cleaning of water tank and Lab. Reports 1 time per year

all Hoses and valves

underground Drain lines

Cleaning and clearing all Drain System

All Drain strainers and hoses

water Heaters replacement

Laboratory water test 2 times/year

all accessories of WC

Drainage manhole covers

all labor charges and on call visits

 

Water pumps

 

 

water tank replacement

 

 

 

 

 

 

2

Electricity from DB to sockets and lights

All light bulbs supply

Light Fittings

All labor charges and on call visits

30 JD's/month include power quality check ones/year

20 JD's/month include power quality check ones/year

All wall sockets and switches

outdoor lights

Power quality test ones/year

all Sub DB breakers and wirings

main DB

Safety check ones/year

 

 

 

 

 

3

All Manual Doors and Windows

all Accessories of doors and windows

Glass

All labor charge and on call visit

25 JD's/month

15 JD's/month

Door leaf and frame

two programed visit checking all

Aluminum frames

 

 

 

 

 

 

4

Walls and Floors

 

Chairs marks and foot marks and Full area paint not included Tiles not included

All labor charges for repairing tiles

45 JD's/month

30 JD's/month

 

Touchups paint with materials

Tiles repairing

 

 

 

 

 

5

Kitchen Cupboards

all Kitchenette Aluminum units

kitchen equipment not included

All Labor charges and on call visits

20 JD's/month

15 JD's/month

Handles, Hinges, frames

water seals and ventilation

 

 

 

 

 

6

AC servicing

Thermostat

Compressor

All Labor charges and on call and programed two visits / year

14.5 JD's per cooling ton/month minimum 4 tons

8 JD's per cooling ton/month minimum 4 tons

Remote

Control Cards

Valves

Evaporator

Gas

Condenser

Fan

 

7

Heating System and Hot Water sys.

All consumable parts Valves pump repair kits Nozzles hoses pipes collectors thermostats timers and switches

Complete Burner

All labor charges are covered programed 2 visits

9.5 JD's per month per system

4.5 JD's per month per system

Complete Radiator

Complete water heater

complete water pump

Control card

1

Laboratory report for Drinking water

All are included in With spare or Without spare Contract

Total per Apartment per month

184

117.5

2

Laboratory report for Swimming pools water

3

Laboratory Report for indoor Air Quality

Total per Apartment per Year

2208

1410

4

Health & Safety Check

5

Electric power Quality check